SpECgrout C3 is a premium, one-part, shrinkage compensated grout designed for high fluidity and ease of application. Supplied in convenient 25kg sealed bags, it only requires the addition of clean water to achieve excellent flow properties for filling large voids in construction applications.
Ideal for use under machine base plates and structural units, SpECgrout C3 ensures superior compressive strength and minimal downtime for machinery installation.
SpECgrout C3 is designed for a wide range of grouting applications, particularly where performance and reliability are essential:
SpECgrout C3 offers a range of benefits that enhance its performance and suitability for various construction applications:
SpECgrout C3 is engineered to meet high-performance standards in construction applications. Below are the key technical specifications:
Property | Value |
---|---|
Compressive strength (BS EN 12390-3) | 3 Days: 45±5 N/mm² |
7 Days: 55±5 N/mm² | |
28 Days: 70±5 N/mm² | |
Setting time (BS EN 196-3) | Initial set: 2 hours @ 25°C |
Final set: 2.5 hours @ 25°C |
Application
Preparation:
The substrate must be clean and completely free from contaminants including greases, oil, and loose material. To avoid absorption and reduction in flow characteristics, it is essential that the prepared substrate is soaked with clean water for a few hours prior to grouting. Prior to placing the grout, any water remaining on the surface should be removed by blowing clean with oil-free compressed air.
Base Plate Cleaning:
The underside of the base plate to be grouted should be clean and any oil or grease MUST be removed. The underside should preferably have no geometry that would impede the flow of grout. Should cruciforms be present, it is essential that air release holes are drilled through the base plate to avoid trapping air, thus reducing the total contact area.
Formwork:
All formwork should be sealed to prevent loss of grout during pouring. The formwork should be tight to the base plate and parallel to the direction of flow. A gap of around 100mm is required at the pouring hopper with a gap of around 50mm at the opposite end.
Pouring Procedure:
Mixed product should always be poured from the hopper end of the formwork. On no account should grout be poured from more than one side of the base plate. Maintenance of a fluid head is essential to avoid air entrapment.
Curing:
Once the grouting has been completed, all exposed areas of grout should be cured immediately using SpECcure AC curing membrane.
Packaging:
SpECgrout C3 is supplied in 25kg sealed polyethylene bags. Each bag should be measured in an accurately graduated vessel.
Warranty:
If you have any questions regarding the warranty for SpECgrout C3, please contact our SMCC team using any of the available contact methods on this page for more information.
For inquiries regarding SpECgrout C3, including technical specifications, pricing, or project support, please contact our dedicated team. We are here to assist construction and contracting companies in finding the right solutions tailored to your specific needs and ensure successful project execution.
Download TDS
WhatsApp Message
0543514030
Have questions or need assistance? Fill the form or reach us directly on: