SpECtite DPR6

Rubberized bitumen coating for corrosion protection and waterproofing.

SpECtite DPR6 is a high-grade rubberized, emulsified bitumen protective coating designed to offer exceptional corrosion protection and waterproofing for various substrates including metals and concrete. Its non-toxic formulation makes it safe for a wide range of applications.
With excellent adhesion, SpECtite DPR6 dries to a tough, resilient black coating that withstands harsh environmental conditions, ensuring long-lasting performance in diverse construction projects.

Product Videos

Technical Details

The typical applications of SpECtite DPR6 include:
– General waterproofing for most building materials, including concrete, asbestos, cement, roofing felt, asphalt, wood, lead, zinc, and corrugated iron.
– Protection against corrosion of pipes, steel structural works, and other metallic surfaces.
– Protection for concrete foundations, retaining walls, column necks, ground beams, and other structures liable to be backfilled.
– As a curing membrane for hydration of cement.
The SpECtite DPR6 offers numerous advantages that make it an ideal choice for construction and waterproofing applications. Its unique formulation and properties provide effective solutions tailored to meet the needs of various projects. The key advantages include:
– Very effective on various substrates.
– Ready to use and easy to apply.
– Odorless and non-toxic.
– Excellent adhesion on prepared substrates.
– Resists chemicals and salts.
– Effective on damp surfaces.

The SpECtite DPR6 features detailed technical specifications that highlight its performance and suitability for various applications:

Density 1.01 kg/litre
Flash Point 32°C
Toxicity Non-Toxic
Heat Flow Resistance The cured film will not sag or flow under service conditions.
Service Temperature Limits Maximum 80°C*
Standard Compliance BS 6949

The SpECtite DPR6 is designed for versatile application across various substrates. The following outlines the application guidelines for optimal results:

Surface Preparation:
Concrete surfaces must be clean, sound, and free from oil, grease, dirt, dust, and loose particles. It is desirable to dampen the surface with water if the concrete or block work is dry.
Metal surfaces must be wire brushed to remove loose rust, mill scale, etc. Wipe off oil and grease from the surface with a suitable solvent.
It is recommended to use a primer coat of SpECtite DPR6 Primer at the rate of 0.1 to 0.25 kg/m² to ensure proper bonding of subsequent coats.
Method of Application:
Apply a minimum of two coats of SpECtite DPR6 using a brush or broom.
Each coat should be applied at right angles to the previous one to obtain proper coverage and uniformity.
The first coat must be fully dry before the subsequent coat is applied. Normal drying time is between 1 to 4 hours. In conditions of high humidity and cold weather, this may extend up to 12 hours or more.
If required, blind the final coat with clean sharp sand while it is tacky to improve heat resistance and prevent premature aging and atmospheric degradation.

The SpECtite DPR6 is available in the following packaging options:

  • 15 litre drums
  • 200 litre drums

The SpECtite DPR6 is backed by SMCC’s commitment to quality. For detailed warranty information and assistance, please contact our team using any of the contact methods available on this page.

Product FAQ

SpECtite DPR6 forms a tough, resilient barrier that adheres well to metal surfaces, preventing moisture and corrosive agents from penetrating, thus protecting against corrosion effectively.
SpECtite DPR6 can be applied to concrete, asbestos, cement, roofing felt, asphalt, wood, lead, zinc, and corrugated iron surfaces, as well as metal surfaces including pipes and steel structural works.
Yes, SpECtite DPR6 is effective on damp surfaces and can be applied in wet conditions.
A minimum of two coats of SpECtite DPR6 are needed for optimal performance.
The normal drying time for SpECtite DPR6 is between 1 to 4 hours. In high humidity and cold conditions, it may extend up to 12 hours or more.
To apply SpECtite DPR6 effectively, ensure that surfaces are clean, sound, and free from contaminants. For concrete, dampen the surface if it’s dry. For metal, remove rust and grime. Use a primer coat of SpECtite DPR6 Primer for better adhesion. Apply a minimum of two coats using a brush or broom, with each coat at right angles to the previous one. Allow the first coat to fully dry (1 to 4 hours) before applying the next. In humid conditions, drying may take longer. Optionally, blind the final coat with sharp sand while tacky to enhance performance.

SMCC AI

Ask it Anything!

Related Products

Get a call back

For more information on SpECtite DPR6 and how it can enhance your construction projects, please reach out to our team. We are here to provide you with technical support, application guidance, and any details needed to meet your construction requirements effectively.

Documents

Download TDS

Email Us

info@smcc.com.sa

Send Us

WhatsApp Message

Need Help?

0543514030

SpECtite DPR6