SpECbuild Primer E1

Two-part epoxy resin bonding agent for cementitious materials.

SpECbuild Primer E1 is a two-part epoxy resin bonding agent designed to achieve an exceptional bond between existing concrete surfaces and subsequent cementitious or epoxy-based materials. This product ensures superior adhesion by creating a high-strength interface, ideal for various construction applications.

Its solvent-free formulation promotes an impervious barrier to chlorides, enhancing the durability of your concrete repair systems.

Product Videos

Technical Details

The following are the typical uses for SpECbuild Primer E1:

  • Concrete repair applications
  • Bonding of floor screeds
  • Bonding newly poured concrete to existing concrete

SpECbuild Primer E1 offers numerous advantages, making it an exceptional choice for bonding applications in construction and repair projects.

  • High mechanical strength
  • Produces a bond that exceeds the cohesive strength of the concrete
  • Provides an impervious barrier to the passage of chlorides
  • Solvent free

The following technical information outlines the performance characteristics of SpECbuild Primer E1:

Property Value
Compressive strength (BS 6319: Pt 2) 50 N/mm²
Slant Shear strength (BS 6319: Pt 4) 40 N/mm²
Pot life at 20°C 6 hrs
Pot life at 30°C 3 hrs
Max. overlay time at 20°C 20 hrs
Max. overlay time at 30°C 10 hrs
Initial hardness at 20°C 48 hrs
Initial hardness at 30°C 24 hrs
Full cure 7 days

Application of SpECbuild Primer E1

Proper application is essential to achieve the desired bonding performance of SpECbuild Primer E1. The following steps outline the preparation and application process:

Preparation:

Before applying SpECbuild Primer E1, ensure that the prepared surface is free from laitance, dust, algae, oil, and grease. Adequate preparation is crucial for a successful bond.

Mixing:

SpECbuild Primer E1 is supplied in a two-component kit, consisting of a base component and a curing agent. Both components must be briefly stirred to ensure any settled products are fully suspended. The entire contents of the curing agent should then be emptied into the base component, ensuring that the sides of the curing agent tin are scraped to remove all material. Combine the materials using a suitable slow-speed drill and mixing paddle for a minimum of 2 minutes until uniform, scraping the sides of the container and mixing for an additional 2 minutes.

Application:

The mixed product may be applied by brush or suitable applicator. It is recommended that a theoretical consumption rate of 5 m²/litre is expected. Where SpECbuild Primer E1 is used as part of the SpECbuild concrete repair system, care should be taken to ensure an unbroken coating. One coat should be applied and allowed to gel before applying a second coat, which will provide the necessary bond. In applications where a subsequent repair product is to be sprayed, sharp sand may be broadcast onto the surface of the second coat of the primer.

Application Temperature Range:

For optimal performance, SpECbuild Primer E1 should be applied within the following temperature ranges:

  • Minimum: 5°C
  • Maximum: 35°C

To improve mixing and application characteristics, it is advised to store the material in an environment above 5°C if the ambient temperature is lower. If temperatures exceed 35°C, the pot life will be reduced; thus, storing the material in a cool environment is recommended.

SpECbuild Primer E1 is available in various packaging options to suit your project needs:

  • 1 litre units
  • 2 litre units
  • 5 litre units

The theoretical consumption rate is 5 m²/litre.

Warranty Information:
For detailed information about the warranty for SpECbuild Primer E1, please contact our SMCC team using any of the contact methods available on this page.

Product FAQ

SpECbuild Primer E1 can bond to clean, sound concrete surfaces, including existing concrete, newly poured concrete, and floor screeds.
The pot life of SpECbuild Primer E1 is 6 hours at 20°C and 3 hours at 30°C.
Surfaces should be free from laitance, dust, algae, oil, and grease. Adequate preparation is essential to ensure a successful bond.
The maximum overlay time for application is 20 hours at 20°C and 10 hours at 30°C.
SpECbuild Primer E1 should be applied within a temperature range of 5°C to 35°C for optimal performance.
The compressive strength of SpECbuild Primer E1 is 50 N/mm².

SMCC AI

Ask it Anything!

Related Products

Get a call back

For inquiries regarding SpECbuild Primer E1 and its applications in your projects, please fill out the contact form. Our expert team is ready to assist you with technical information, pricing, and product availability to help ensure the success of your construction initiatives.

Documents

Download TDS

Email Us

info@smcc.com.sa

Send Us

WhatsApp Message

Need Help?

0543514030

SpECbuild Primer E1