SpECcoat Zn25

One-part zinc epoxy primer for corrosion protection.

SpECcoat Zn25 is an innovative one-part primer formulated from a unique blend of epoxy resin and zinc, designed to provide exceptional corrosion resistance for exposed reinforcement. This product ensures strong adhesion to surfaces and is compatible with cementitious repair mortars.
Ideal for use in various construction applications, it plays a crucial role in prolonging the longevity and durability of reinforced concrete structures.

Product Videos

Technical Details

SpECcoat Zn25 is recommended for various applications where corrosion resistance is required. Typical uses include:
• Primer for exposed reinforcement
• Preparation before applying SpECbuild cementitious repair mortars
• Corrosion protection in construction projects
• Suitable for use in high humidity environments
SpECcoat Zn25 offers a range of advantages that enhance its performance and usability in various construction applications. The following benefits make it an ideal choice for corrosion protection: • One part formulation for easy application
• High metallic zinc content inhibits corrosion
• Specifically compatible with SpECbuild cementitious mortars
SpECcoat Zn25 is designed with specific technical parameters that ensure its effectiveness and reliability in construction applications:
Property Value
Specific Gravity 1.925
Overcoating Time (max) @ 10°C: 120 min
@ 20°C: 60 min
@ 30°C: 40 min
@ 40°C: 20 min
Overcoating Time (min) @ 10°C: 60 min
@ 20°C: 30 min
@ 30°C: 20 min
@ 40°C: 10 min
Typical Wet Film Thickness 150 microns
Typical Dry Film Thickness 45 microns
Coverage Typically 7.0 m²/litre
Application Instructions:
Preparation:
It is essential that adequate preparation is carried out prior to the application of SpECcoat Zn25. If it is determined that chloride ingress was the cause of the corrosion, the grit blasted area should be treated by high pressure washing.
Any corroded reinforcing steel should be grit blasted to bright metal, to remove all scale and corrosion products. It is essential this treatment continues over the rear of the reinforcing steel.
Application:
It is essential that there is no delay in the application of SpECcoat Zn25 once the steel is dry. Delays greater than one hour should be avoided.
Stir the contents of the tin to ensure that any settlement is redispersed. The product should be applied by brush ensuring continuous coverage over the total surface area of the exposed steel. It may be necessary to apply a second coat if it is felt that some gaps may exist in the first coat. In this case, allow the first coat to dry fully before application of the second coat.
Once the priming operation is complete and has fully dried, it is essential that the repair mortar is applied as soon as possible. In environments where high temperature and high humidity prevail, this period should not exceed three days.
SpECcoat Zn25 is available in various packaging options to meet your project needs:
1 litre, 2.5 litre and 5 litre tins.

For warranty information regarding SpECcoat Zn25, please contact our team at SMCC. We are here to assist you with any inquiries and provide the necessary details about our warranty policies. Use any of the contact methods provided on this page for further assistance.

Product FAQ

SpECcoat Zn25 can be applied to exposed reinforcement and rusted steel surfaces in construction projects. It is specifically designed for use with cementitious repair mortars, ensuring compatibility and effective corrosion protection.
SpECcoat Zn25 typically takes a maximum of 120 minutes to dry at 10°C and reduces to 20 minutes at 40°C.
Yes, SpECcoat Zn25 is suitable for high humidity environments.
The coverage area of SpECcoat Zn25 is typically 7.0 m² per litre.
SpECcoat Zn25 should be applied by brush after proper surface preparation. Stir the contents to redisperse any settlement. Ensure continuous coverage over the exposed steel, applying a second coat if needed after the first coat has dried fully. Avoid delays in application after the steel is dry, and apply the repair mortar as soon as the primer has dried.
To apply SpECcoat Zn25, ensure the surface is clean and dry. Stir the product to redisperse any settlement. Use a brush for application, ensuring continuous coverage over the exposed steel. If necessary, apply a second coat after the first has fully dried.

SMCC AI

Ask it Anything!

Related Products

Get a call back

For inquiries regarding SpECcoat Zn25 or to receive further information on its application, technical specifications, and compatibility with other materials, please fill out the contact form. Our expert team at SMCC is ready to assist you with your construction project needs.

Documents

Download TDS

Email Us

info@smcc.com.sa

Send Us

WhatsApp Message

Need Help?

0543514030