SpECbuild LWC50

Lightweight, polymer-modified cement repair mortar.

SpECbuild LWC50 is a one-component, pre-packed, polymer-modified cementitious repair mortar designed for versatile applications in concrete restoration. Its unique formulation provides high-build characteristics while maintaining excellent compressive strength. This lightweight compound is particularly suited for hot climates, ensuring ease of use and consistent performance. Whether addressing structural repairs or surface profiling, SpECbuild LWC50 delivers durable results in challenging conditions.

Product Videos

Technical Details

SpECbuild LWC50 is suitable for a variety of concrete repair applications, including but not limited to:
– The replacement of debonded, cracked or damaged concrete
– To repair concrete structures or buildings suffering from carbonation or chloride attack
– The reinstatement of “honeycombing”
– Reprofiling concrete and masonry
– Overhead and vertical situations where the product is particularly suited
SpECbuild LWC50 offers several advantages, making it a premier choice for concrete repair in various conditions. Its formulation is designed to enhance application ease and durability, particularly in challenging environments. The key benefits include:
– Provides excellent application and performance characteristics in hot climates
– Pre-packaging and quality raw materials ensure constant performance
– Fast and easy to use, needing only the addition of clean water
– Extremely low permeability, inhibiting the ingress of carbon dioxide and chloride ions
– High bond strength to concrete substrates using SpECbuild Primer E1 or Primer S1
– Contains additives to compensate for shrinkage
– Chloride free
– Compatible with the thermal expansion properties of typical structural concrete
– High build properties with excellent compressive strength
SpECbuild LWC50 is formulated to meet various technical specifications, ensuring optimal performance in concrete repair applications. Below are the key technical data points:
Property Result
Compressive Strength (BS 6319-2) 1 Day: 15 N/mm²
3 Days: 30 N/mm²
7 Days: 33 N/mm²
28 Days: 36 N/mm²
Flexural Strength (BS 6319-3) 28 Days: 7 N/mm²
Tensile Strength (BS 6319-7) 28 Days: 3 N/mm²
Pull-Off Strength (ASTM D4541) 2.6 N/mm²
Water Absorption ISAT (BS EN 1881-208) 30 Minutes: nil
Setting Time (BS EN 196-3) Initial: 3.5 hours
Final: 4.5 hours
Linear Shrinkage (ASTM C531-00) 7 Days: 0.033%
Application:
Preparation:
It is essential that adequate preparation is carried out prior to the application of SpECbuild LWC50. The boundary of the repair area should be cut using a concrete saw to provide a neat edge to the repair with no feather edging. It is recommended that the saw cut be approximately 10-12mm deep. The area to be repaired may then be broken out up to the prepared boundary. The resultant surface should be cleaned thoroughly to ensure the complete removal of dust, reinforcement corrosion products, oil, and grease. The prepared surface should be protected if any delay is anticipated prior to the application of the repair compound.
All reinforcement, which shows signs of corrosion, must be fully exposed to an adequate depth behind the bar to allow ease of application of the repair compound. The steel should be grit blasted to bright metal immediately prior to the application of SpECcoat Zn25 zinc-rich protective coating. Apply one coat of SpECcoat Zn25 to the cleaned steel ensuring full coverage. Allow to dry before commencing the next step.
Substrate Priming:
For most situations, the substrate should be primed with SpECbuild Primer S1. Initially, the surface should be thoroughly saturated without standing water prior to the primer being applied. SpECbuild Primer S1 should be applied by brush ensuring intimate contact with the substrate. This is best achieved using a circular scrubbing action. SpECbuild LWC50 can be applied as soon as the primer becomes tacky.
To provide an exceptionally high strength sealed bond to the substrate (e.g., to repair chloride-induced corrosion damage) SpECbuild Primer E1 epoxy resin-bonding agent may be used. One coat should be applied and allowed to gel. A second coat should then be applied and used to provide the bond.
Mixing:
SpECbuild LWC50 is a one-component cementitious repair mortar. For mixing a single bag, a 25-litre steel pail is suitable, using a slow-speed electric drill (350/600rpm) fitted with a SpECbuild Mixing Paddle. The mixing water used must be in the range of 3.75 litre to 4.2 litre. The quantity used will depend on the type of application and the skill of the applicator. This product cannot be mixed by hand. The material should be mixed for a minimum of 5 minutes to ensure complete and thorough dispersal. Mixing of part bags is not recommended.
Application:
The mixed material should be applied immediately after mixing is completed. The material should be applied by a gloved hand to ensure thorough compaction around the reinforcement and against the edges of the reinstatement area. The repair is then finished by trowel. The application thickness will depend on the repair configuration; however, as a general rule, thickness of 40mm may be achieved in overhead situations and 75mm in large vertical repairs. Repairs incorporating supporting formwork may be applied up to 120mm thick. The product must not be applied under 10mm in thickness.
Applications in excess of the thickness quoted above may be achieved by “keying” the compacted layer and then applying SpECcure WE as a curing coat. Once this layer has reached sufficient strength, SpECbuild Primer S1 may be applied as a primer coat and application proceeds as before.
Curing:
The reinstated area must be protected immediately after completion by the spray application of a suitable curing membrane such as SpECcure WE. This is of extreme importance at temperatures in excess of 30°C, and secondary protection should also be considered to completely seal the repair area against drying conditions, which would render the repair completely ineffective.
SpECbuild LWC50 is available in convenient packaging options for efficient use:
– Product: SpECbuild LWC50
Packaging: 25kg bags
Coverage: 1.6m² @ 10mm thick (16 litres of mixed product)
– Product: SpECbuild Primer S1
Packaging: 1 & 5 litre tins
Coverage: 5-6m²/litre
– Product: SpECbuild Primer E1
Packaging: 1 & 5 litre tins
Coverage: 5m²/litre
– Product: SpECcoat Zn25
Packaging: 1 & 5 litre tins
Coverage: 7-8m²/litre
– Product: SpECcure WE
Packaging: 200 litre drums
Coverage: 5m²/litre

If you require additional information regarding the warranty for SpECbuild LWC50, please reach out to our team at SMCC using any of the contact methods provided on this page.

Product FAQ

The application thickness limits for SpECbuild LWC50 are 10mm minimum and up to 120mm maximum, depending on the repair configuration.
For mixing SpECbuild LWC50, a slow-speed electric drill (350/600rpm) with a SpECbuild Mixing Paddle is recommended. A 25-litre steel pail is suitable for mixing a single bag. Mixing by hand is not advisable.
The curing process for SpECbuild LWC50 involves protecting the reinstated area immediately after application by spraying a suitable curing membrane, such as SpECcure WE. This is crucial, especially in temperatures exceeding 30°C, to prevent drying conditions that could compromise the repair effectiveness. Secondary protection should also be applied to ensure complete sealing of the repair area.
When handling SpECbuild LWC50, wear gloves, goggles, and a dust mask to prevent skin and eye contact, and avoid inhalation of dust during mixing. Wash any skin contact with soap and water, and flush eyes with clean water if contact occurs, seeking medical attention if necessary. Keep the product away from ignition sources as it is non-flammable but some associated products may be flammable. Ensure adequate ventilation during use.
Personal protective equipment required for LWC50 includes gloves, goggles, and a dust mask.
During the application of SpECbuild LWC50, ensure to wear gloves, goggles, and a dust mask to protect against skin and eye contact. Avoid inhaling dust while mixing. Make sure the work area is well-ventilated. Clean equipment immediately after use with water to prevent hardening of the product in tools. If skin contact occurs, wash thoroughly with soap and water. In case of eye contact, rinse with clean water and seek medical attention.

SMCC AI

Ask it Anything!

Related Products

Get a call back

For more information about SpECbuild LWC50 or to discuss your specific project needs, please fill out the contact form below. Our team at SMCC is dedicated to providing you with expert support and reliable solutions tailored to the construction and contracting industry.

Documents

Download TDS

Email Us

info@smcc.com.sa

Send Us

WhatsApp Message

Need Help?

0543514030